Kinder Morgan Tejas 20-Inch Class Change

Missouri City, Texas

Binkley & Barfield was selected to provide engineering, survey, and staking services to replace 1,300 LF of 20” pipeline for a class change and a block valve assembly was relocated within the replaced project vicinity. The new pipeline is adjacent to a Missouri City park lake, which involved cooperation and approval from the city.  An access road to the new valve site was required and was designed and specified in accordance with company and city requirements.  A metes and bounds description was provided for the new valve site and access road.  The pipeline and valve site design was in accordance with company, federal, state, and local regulations.

Overview:
Drawing and specifications
Utility research
Topographic Survey
Metes and bounds
Access road