Construction Management
Traffic & Tollway Design
![]() |
BBI provided strategic planning and careful evaluation of the problems of the Westpark Tollway expansion.
With over 370,000 vehicles daily flowing through the US 59 and IH 610 Interchange in Houston, BBI successfully completed the project while maintaining consistent traffic control, zero drainage hydraulic impact to the vicinity and coordination with area transporation organizations.
The scope of services provided by Binkley & Barfield, Inc included:
- route and design studies
- field survey
- roadway design controls
- drainage design
- and bridge design.
The project included thirteen direct connectors, US 59 mainlane, and HOV bridges to take bi-directional toll road traffic and frontage road traffic under the existing US 59/IH 610 interchange. Storm water runoff was mitigated through the design of two detention basins located within the interchange. Two pump stations were designed to discharge the storm water to an existing outfall structure adjacent to the project. The use of drilled shaft retaining walls allows for future bridge foundations to be located behind the walls and were also used for bridge abutment foundations.
The Westpark Tollway and US 59/IH 610 Interchange project involved complex criteria to be addressed in an effective, cost conscious manner. The fast track construction included thirteen mainlanes, HOV and direct connector bridges,complex traffic control for the US 59/IH 610 Interchange, zero drainage hydraulic impact to the vicinity of the interchange, detention basins, complex design and construction coordination.
McKinney Roadway Design
![]() |
Helping communities in the City of McKinney...
Helping communities in the City of McKinney, Binkley & Barfield, Inc. provided design expertise for the infrastructure initiative. Designing road improvement affecting three thoroughfares within the City of McKinney - including Wilcox Drive, Jefferson Street, and Graham Drive - BBI's DFW Regional office staff provided the following services:
- Construction Management Services for design of 4,800 LF of 26-foot wide residential roadway
- Construction Management Services for design of 17,500 SF of concrete sidewalk
- Construction Management Services for design of 14,000 SF of concrete driveway.
- Construction Management Services for design of the replacement of 2,250 LF of 8" and 2,250 LF of 12" waterline, 4,500 LF of 8" sanitary sewer
- Construction Management Services for design of existing asphalt roadway and ditches with curb and gutter and 2,100 LF of storm sewer
- Design included DART crossing at Jefferson Street
Park & Ride Facilities
![]() |
METRO Kuykendahl Park & Ride Facility Expansion Project
Providing complete engineering services, BBI designed the METRO Park & Ride facility located at Kuykendahl and De Montrond Road. This facility featured a 2-level, 6-bus-bay structure for pickup and drop off of passengers, a passenger waiting area, and 2240 car parking lot. Reconstruction of DeMontrond Road between Kuykendahl and IH 45 southbound frontage road was required. Additional services included design of on-site water supply and waste water treatment facilities, storm water pollution prevention plan, the redesign of site drainage, and passenger walkway shelters.
BBI provided design support services during the construction of the Kuykendahl Park & Ride Facility Expansion project, including clarifications in the form of interpretations and explanation of design in order to resolve conflicts and questions concerning the drawings and specifications. BBI provided review and recommendations of shop drawings, erection drawings, data, samples, schedules, test results and similar data submittals by the Construction Contractor. BBI provided review, evaluation and prepared documentation and estimates for any design changes due to construction problems, differing site conditions, conflicts or similar reasons. BBI coordinated Construction Progress meetings and performed site visits as requested by METRO
North Sam Houston Tollway
![]() |
Custom expansion from West of Lewis Lane to East Ella Blvd
Binkley & Barfield, Inc. was responsible for the design and construction phase services for the Harris County Toll Road Authority 6-lane tollway project with provision for 2 additional lanes and full shoulders from west of Lewis Lane to east of Ella Boulevard. In addition the project included design of:
- Grading, pavement, retaining wall and drainage
- A 540 linear feet combination steel girder type IV Beam Bridge over an active fault diagonal to the grade separation.
- A unique expansion joint system was required to meet project geotechnical requirements.
The project special requirements included:
- Custom expansion joint design of 50 year design movement of active ground fault.
- Total time allowed from beginning of design to delivery of construction documents was 6 months.
.
Inspection Services - Sam Houston Tollway Construction
![]() |
Beltway 8 Northeast Construction Inspection Services for the Harris County Toll Road Authority
Binkley & Barfield, Inc. was recently awarded a project to perform construction inspection services on the Sam Houston Tollway Northeast section by the Harris County Toll Road Authority (HCTRA). This new tollway will consist of mainlanes, overpass bridges and all electronic tolling equipment.
BBI field inspectors are responsible for the construction inspection of the following:
- underground utility and storm sewers
- paving
- electronic tolling equipment
- conduit
- overhead guide sign structures
- bridges
- retaining walls
- pavement markings
- illumination and earthwork.
Using vehicles meeting HCTRA's high-level safety standards, the inspectors will utilize HCTRA's newly developed Capital Projects Management Tracking System (CAPTRAC) database to enter their inspection reports for daily tracking. Inspectors are pulling night duty as the contractor has moved to a fast track 24 hr schedule to meet project incentives.